Lean magnetic dry-erase board

The boards come in several standard sizes. We also make them in any size you need.

If you need a different print or your own version of the board, we can design and make it for you. If you already have your own artwork, use this product: board with your own graphics and order it comfortably online.

The board comes in three versions:

Lean boards can be fitted outdoors, because they are resistant to weather, durable and easy to keep clean.

Great facts about the dry-erase surface

Our boards have a modern dry-erase surface that lets you clean the board completely, even when the writing has stayed on it for a long time.

Dry-erase boards come in a matte and a gloss version.

Technical specification
Self-adhesive board PVC board Board in an aluminium frame
Board thickness 2 mm 7 mm 16 mm
Durability of the dry-erase surface High. The board wipes clean easily even after a few weeks, and its properties do not change over time.
Gloss finish Excellent dry-erase performance for heavy use. It can reflect light when you work in a sunlit room.
Matte finish Slightly weaker dry-erase performance, may need board cleaning fluid, does not reflect light.
What to write with We recommend dry-erase markers from established brands, which you will find in the accessories section.
Which magnets Every kind except holiday souvenir magnets with big housings. For pinning up notes we suggest magnets at least 30 mm across or neodymium ones. Any
How to fit As a sticker, just peel off the backing paper. You need no tools at all! Double-sided tape or mechanical fixing (bolts, wall plugs). The board has a hidden hook mounting system.
Mounting surface Any smooth surface (walls, doors, furniture, glass) except walls painted with paints high in latex, washable paints, stain-resistant paints and facade paints. If you have used paint of that kind, order board samples and test them on your wall, or choose the PVC board. any surface
Weather resistance Yes, when it is stuck to a non-absorbent surface such as sheet metal or plastic. Yes, the board is made entirely of plastics. The board is meant for indoor use only, in rooms free of damp. If you do need a framed board outdoors or in a room with raised humidity, get in touch with us!
We also offer tools that support a lean rollout in your company:
Lead time

We make lean boards within 3 to 7 business days.

Please note, paints high in latex, washable paints, stain-resistant paints and facade paints all reduce how well self-adhesive boards stick. If you decide to put a decoration on that kind of surface, you do so at your own risk, because we do not accept complaints connected with those paints. In that case we recommend boards on a PVC backing or in aluminium frames.

This product will be made especially for you, to your own order. We guarantee the finest workmanship.

Complete the set

Recommended accessories

Proof you can check

Customer reviews 4.97/5 (2,306 reviews)

20489
971
1415
Wally
Magnetic Whiteboard Gantt Diagram 074 Division Into Days Of Month
36.12
EUR