Lean dry-erase boards bring together an excellent dry-erase surface and a print that helps you run a company or a plant. The boards come in two versions to choose from, self-adhesive and on a PVC backing.

On request we make boards in any size.

Specification
Self-adhesive boardPVC board
Board thickness0.2 mm5 mm
Durability of the dry-erase surfaceHigh. The board wipes clean easily even after a few weeks, and its properties do not change over time.
Gloss finishExcellent dry-erase performance for heavy use. It can reflect light when you work in a sunlit room.
Matte finishSlightly weaker dry-erase performance, may need board cleaning fluid, does not reflect light.
What to write withWe recommend Toma dry-erase markers, which you will find in the accessories section.
How to fitAs a sticker, just peel off the backing paper. You need no tools at all! Double-sided tape or mechanical fixing (screws, wall plugs).
Mounting surface Any smooth surface (walls, doors, furniture, glass) except walls painted with paints high in latex, washable paints, stain-resistant paints and facade paints. If you have used paint of that kind, order board samples and test them on your wall, or choose the PVC board.Any surface.
Weather resistanceYes, the board is made entirely of plastics.

If you need a different print or your own version of the board, we can design and make it for you, so get in touch with us by email! If you already have your own artwork, use this product: board with your own graphics and order it comfortably online.

Delivery

If the dimensions of a board on a PVC backing add up to more than 275 cm, please choose oversized delivery when you place the order.

Lead time

Once your payment clears, your order is made within 3 to 5 business days and then it ships.

This product will be made especially for you, to your own order. We guarantee the finest workmanship.

Complete the set

Recommended accessories

Proof you can check

Customer reviews 4.97/5 (2,303 reviews)

26839
971
1415
Wally
Gannt Diagram 111 Dry-Erase Board
16.54
EUR